ぺ ニス 増大 カマグラ ed 治療 薬 性病 症状 性病 症状 睡眠薬 シルデナフィル ぺ ニス 増大 サプリ カマグラ ゴールド ぺ ニス 増大
Scarpe air jordan scarpe da calcio nike free nike cortez nike roshe air max new balance oakley converse Scarpe Adidas scarpe Nike Scarpe louis vuitton Ray ban adidas
Home Gallery Quotation Swatches Templates & Fitting FAQ's Contact Us
lunette de soleil oakley nike huarache Chaussure asics nike air huarache adidas stan smith nike free nike presto chaussures sport chaussure converse Air max casquette nike sb ceinture bijoux pandora adidas chaussure chaussures de sport Chaussures air jordan femme nike air jordan nike air max femme chaussures femme louis vuitton sac nike air presto
new balance oakley converse Scarpe Adidas scarpe Nike Scarpe louis vuitton Ray ban adidas Adidas superstar longchamp air max Cinture scarpe Puma Puma Scarpe Scarpe nike air max scarpe asics nike air force Saucony polo camicie Polo Ralph Lauren
Colours
Trade Partners

Site Survey Requirements

Ensuring that the requirements listed below are met will make our visit more productive, accurate and reduce the likelihood of an aborted visit. (A £150 call out fee will be charged for an aborted visit due to the requirements not being met).

Please ensure that the below requirements are met prior to our visit

 

    
 
  •   
The latest detailed drawings have been sent to us.      

 A representative will be on site to advise our surveyor and to allow access.     
              
  •  
The area has been completely cleared as our surveyor will not be reposible for breakages
or damage if they have to move any items.
 
  •  
Where applicable, the walls have been prepared to a straight and finished standard.
 
  •  
All wall and base cabinets installed including worktop supports (where applicable) and end panels.  
 
  •  
Hobs (where applicable) on site and position clearly defined.
 
  •  
Under mounted sinks must be installed and over mounted sinks must be on site.
Applicable sink/hob templates must also be on site. 
 
  •  
Tap location (where applicable) clearly defined and the tap on site. 
 
  •  
All electrical back boxes fitted in final position, including face plates (minimum 50mm front edge
of glass and 50mm between sockets) 
 
  •  
All boxing around pipes etc fitted. 
 
  •  
Where applicable, hobs, extractors or other appliances have been fitted then removed by your fitter, hole positions and other fittings clearly marked to enable our surveyor to evaluate installation 
 
  •  
Where applicable, temporary worktops are to be removed prior to our visit to template.
 
  •  
Arrangement has been made to have your own fitter on site after installation to re-connect appliances
such as hob, extractors, sinks and taps etc. 
 
  •  
You must not alter or add to your kitchen or walls in anyway after the site survey has taken place and 
prior to the installation of your glass products, unless instructed to do so. 
 
  •  
The following must be fitted AFTER installation of splashbacks - 
Pelmet, Cornice, Under-Pelmet Lights.

 

If you have any queries with any of the above or are in any doubt as to what the requirements are, please contact us PRIOR to survey (Template) takes place. Customer Service Department (Mon-Fri 10am-4pm) Tel: 0333 200 4111

scarpe calcio Tiffany Scarpe da donna Scarpe Scarpe Adidas nike air max adidas Scarpe nike air presto new balance Scarpe nike air force Adidas superstar Scarpe Scarpe nike shox hogan air jordan adidas Reebok Adidas Scarpe nike sb nike free christian louboutin adidas Scarpe Scarpe Scarpe hogan oakley scarpe Tacchi
Glass Splashbacks Glass Worktops Digital Printing
HOME | GALLERY | QUOTATIONS | SWATCHES | TEMPLATES & FITTING | FAQS | CONTACT
Scarpe scarpe Nike Scarpe nike air max Cappelli nike air force Saucony scarpe asics Puma polo camicie Polo Ralph Lauren